Thinking about adding a patio cover, repainting your exterior, or building a new fence in Tavola or Valley Ranch? Getting the green light from your HOA can feel slow and confusing. You want to do it right the first time, avoid surprises, and keep your project on schedule. In this guide, you’ll learn exactly how the ARC process works, what to include, how long it usually takes, and a proven path to faster approvals. Let’s dive in.
How ARC approvals work in Tavola and Valley Ranch
Your HOA’s architectural review is guided by the community’s recorded Covenants, Conditions and Restrictions and any Design Guidelines adopted by the HOA board. The Architectural Review Committee, or ARC, applies those rules to your request. Many associations also use a management company to handle paperwork and meeting logistics.
Where to find your rules
Start with the controlling documents for your specific neighborhood:
- Recorded CC&Rs and amendments filed with the Montgomery County Clerk.
- Community Design Guidelines or an ARC application packet from your HOA or its management company.
- Recently adopted board rules or policy clarifications shown in meeting minutes.
- Local permitting offices for building or utility permits. Many exterior projects need both HOA approval and a county or municipal permit.
If you don’t have the documents, request them from your HOA or management company. You can also search recorded documents with the Montgomery County Clerk or check your closing package if you recently bought the home. Confirm whether a municipal utility district or similar entity adds any requirements.
Who reviews your request
Most HOAs use an ARC that meets monthly or has a designated reviewer. The ARC can approve, approve with conditions, request more information, or deny the application. If a variance or board-level decision is required, expect extra review time.
Expected timelines in New Caney HOAs
Every HOA is a little different, but most suburban Texas communities follow similar schedules. Set your expectations up front and plan your project timeline with a bit of cushion.
The typical ARC process
- You complete the ARC application and gather supporting documents.
- You submit through the HOA portal, email, or by hand, as directed.
- The ARC reviews your request at its next meeting or by a designated reviewer.
- You receive a decision: approved, approved with conditions, more information needed, or denied.
- If approved, you obtain any required permits and begin work.
- You may be asked for a final inspection or completion photos.
Realistic review timelines
- Initial completeness check: a few days to 2 weeks.
- Formal ARC review: usually 14 to 30 days after a complete submission.
- If your package is incomplete, many HOAs pause the review clock until you supply missing items.
- If board approval, a variance, or neighbor notification is required, add 2 to 6 weeks.
- From prep to ready-to-start, a typical project takes 3 to 8 weeks, plus longer for complex plans.
Always verify your HOA’s stated review period and whether their clock pauses for missing items.
What to include in your application
A complete, well-labeled packet is the fastest path to yes. Use this checklist to reduce back-and-forth.
- Completed ARC application form, signed and dated.
- Plot plan or site plan to scale showing the project location relative to property lines, easements, and structures. Include distances.
- Property survey, ideally the stamped version from closing.
- Elevation drawings or photos for additions, facade changes, or larger projects.
- Scope of work narrative with materials, colors, finishes, dimensions, and construction methods.
- Color samples or manufacturer color codes for paints and finishes.
- Material samples or product cut sheets for roofing, siding, windows, masonry, or decking.
- Contractor name, license number, proof of insurance, and contact info.
- Drainage or runoff plan if grading, driveways, or pools may change water flow.
- Before photos from multiple angles and context photos of adjacent homes where relevant.
- Neighbor notifications or signatures if your CC&Rs require them for certain items or variances.
- HOA filing fee or construction deposit if required.
- Any permit plan set or an application number if you have already started the county or municipal permitting process.
Submission quality standards
- Provide clear, scaled drawings or accurate dimensions. Hand sketches without measurements often trigger requests for a survey.
- Use manufacturer names and product codes, not generic color names.
- Label every page and add a cover sheet with your name, address, phone, email, and a short project summary.
- For electronic submissions, combine everything into one PDF in the order above. Name it clearly, such as 123Main_Deck_ARC.pdf.
Common pitfalls and how to avoid them
- Incomplete package. Missing surveys, measurements, color codes, or specs slow everything down. Remedy: use the checklist and submit one complete packet.
- Noncompliant materials or colors. If your plan conflicts with design guidelines, it will be flagged. Remedy: match neighborhood standards or explain how your selections are compatible with samples and context photos.
- Setback, easement, or lot coverage issues. Remedy: confirm setbacks on your survey and adjust placements before submitting. If you need a variance, prepare a rationale and neighbor impact notes.
- Drainage concerns. Remedy: include a simple drainage plan showing how runoff will be managed.
- Fence placement and design errors. Remedy: locate property corners on your survey, show post placement and height, and obtain neighbor acknowledgement if required by your CC&Rs.
- Missing contractor credentials. Remedy: hire licensed and insured pros and include proof in your packet.
- Confusing drawings. Remedy: provide clear, labeled drawings and manufacturer specs that remove ambiguity.
- Starting work early. Remedy: do not start before written approval. If you already started, stop, submit a complete application, and be prepared for fines or required corrections.
Fast-approval game plan
Here is a practical workflow that helps Tavola and Valley Ranch homeowners move faster.
Pre-submission checklist (1 to 7 days)
- Read your CC&Rs and ARC guidelines for your neighborhood.
- Walk the property with your contractor and take photos. Confirm property lines on your survey.
- Draft a concise scope and list all materials and colors with product codes.
- Prepare a scaled site plan and simple elevations. Add drainage notes if applicable.
- If required, prepare neighbor notifications. Even when not required, a courtesy heads-up can prevent objections.
Submission day
- Submit one complete PDF packet with a cover sheet and checklist.
- Pay any fee or deposit.
- Request written confirmation of receipt and ask for the expected review date.
Weeks 1 to 4 after submission
- Track the submission date and the HOA’s stated review window.
- Follow up politely if you have not heard back after the stated timeframe.
- Respond quickly to requests for clarification or extra documents.
If approved
- Obtain written approval and review any conditions.
- Secure required county or municipal permits before starting construction.
- Confirm final inspection or sign-off requirements and provide completion photos or as-built drawings if requested.
If denied or conditional
- Ask for a written explanation of the reasons and requested changes.
- Revise plans to address the issues. If you need a variance, add neighbor support and examples of similar approved projects.
- If there is a dispute about the CC&Rs, request a hearing with the board or consult an attorney experienced in Texas HOA law.
Permits and outside approvals
Many projects need both HOA approval and governmental permits. Confirm county or municipal requirements for building, electrical, plumbing, pools, or driveways before you start work. Some projects also need utility provider approval or municipal utility district coordination. Align your permit timeline with the ARC review so you are ready to start once approved.
What happens if you start without approval
Proceeding without written approval can lead to fines, stop-work orders, required removal or restoration, and in serious cases, legal action or liens. The specific remedies vary by HOA and Texas law. If you find yourself in a dispute, pause work and seek qualified guidance.
Neighbor relations and communication
Good communication can speed approvals and prevent complaints:
- Share a simple project summary with nearby neighbors, especially for fences, pools, or additions.
- Provide your contractor’s contact info and expected schedule.
- Keep noise, debris, and parking under control. Courtesy goes a long way when the ARC asks neighbors for input.
When to appeal or request a variance
If your plan conflicts with a guideline but meets the spirit of the rules, a variance may be possible. Many CC&Rs allow appeals to the board after an ARC denial. When you request a variance, include mitigation measures, neighbor support, and examples of nearby approvals that show compatibility.
Local next steps for Tavola and Valley Ranch homeowners
- Request the CC&Rs, Design Guidelines, and the latest ARC application packet from your HOA or management company.
- If needed, search recorded documents with the Montgomery County Clerk.
- Hire licensed, insured contractors who work regularly in Montgomery County.
- Confirm county or municipal permitting requirements before you submit.
- Keep copies of everything and request all approvals in writing.
You do not have to guess your way through this. With a complete packet, clear communication, and a realistic timeline, you can get your Tavola or Valley Ranch project approved and started on schedule. If you want a quick review of your plan or need referrals to local contractors, reach out. My team brings decades of local experience helping New Caney area owners move from idea to approval to completion with less stress.
Ready to plan your next step? Contact Unknown Company to Request Your Free Home Valuation and get personalized guidance for your timeline.
FAQs
How does the HOA approval process work in Tavola and Valley Ranch?
- You submit a complete ARC application with required documents, the ARC reviews within a typical 14 to 30 days of a complete submission, then issues approval, conditional approval, a request for more info, or a denial.
What documents do I need for an HOA ARC request in New Caney?
- Most ARCs require an application form, survey and site plan, elevation drawings, scope of work, product specs and color codes, contractor credentials, photos, and any fees or neighbor notices.
How long do HOA approvals usually take for exterior changes?
- Plan for 3 to 8 weeks from prep to ready-to-start, including ARC review and permit time. Complex projects or variance requests can take longer.
What are common reasons HOAs deny ARC applications?
- Incomplete packages, design guideline conflicts, setback or easement issues, drainage impacts, fence placement errors, missing contractor credentials, and unclear drawings are common causes.
Do I need both HOA approval and a county permit in Montgomery County?
- Many exterior projects need both. The HOA’s approval does not replace county or municipal permits, so confirm requirements before you begin work.
What should I do if my HOA ARC request is denied?
- Ask for written reasons, revise your plan to address them, and consider an appeal or variance with neighbor support and examples of compatible projects.